Ethics: A Design Responsibility
The design/build method of project delivery, because it largely removes the client from the quality control and assurance process, can lend itself to unethical behavior on the part of...

Keeping It Together
A new framing system for precast concrete columns and beams will allow tall buildings to withstand large earthquakes without damage to the structural integrity of the building. By using...

Above Them All
The design for what would be the next world's tallest building relies on a 1,550 ft (472 m) high concrete core that will give occupants of the top floors of the building unimpeded...

Casino Connection
New Jersey's $330-million, 2.2 mi (3.5 km) Atlantic City-Brigantine Connector will provide easy access to gambling casinos when it is completed in May 2001 and is one of the...

Inside Job
River Mill Dam is a large Ambursen (buttress type) dam constructed in 1911 on the Clackamas River in Oregon. The preliminary and final design phase of the seismic upgrade project coincided...

Suspension Solution
The new bridge across the Carquinez Strait near San Francisco, California, will upgrade an important transportation link across the Sacramento River. This new bridge, which renders the...

Safety in a Designer's Hands
Although contractors face safety issues every day, engineers and architects have traditionally not addressed construction site safety in project designs. But there are design practices...

Into the Tunnel
Technological advances in wind tunnel testing and computer-aided design programs are enabling engineers to create taller and more aesthetically interesting buildings than ever before....

Testing the Load (Available in Geoenvironmental Engineering Special Issue only)
The Pittsburgh District of the U.S. Army Corps of Engineers recently began construction of a new gated dam to replace a nearly 100-year-old concrete fixed-crest dam on the Monongahela...

A New Skew
Most bridges that cross roadways or other elements at a skewed angle are designed based on right-angle crossings with inefficient modifications. A new concept for skewed crossings is a...

The Digital Evolution
As designers such as Gehry Architects dream up ever-more fluid and sculptural shapes for buildings, the only way to turn those aesthetic shapes into solid, safe structures is by using...

Taking a New Approach (available in Structural Engineering Special Section only)
The first bridge rehabilitation project in Washington, DC to use the AASHTO Load and Resistant Factor Design (LRFD) specification reveals several lessons to be learned from using the newly...

Tight Squeeze
The Newark, New Jersey Route 21 Viaduct Replacement is a massive, $250 million highway improvement program being undertaken by the New Jersey Department of Transportation. Michael Baker...

Smart Sign Support
The Route 80-MAGIC (Metropolitan Area Guidance, Information and Control) project is considered to be the showcase Intelligent Transportation System (ITS) project for the state of New Jersey....

Building Code Requirements for Masonry Structures (ACI 530-99/ ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ ASCE 6-99/TMS 602-99), Commentary on Building Code Requirements for Masonry Structures, Commentary on Specification for Masonry Structures
Building Code Requirements for Masonry Structures (ACI 530-99/ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ASCE 6-99/TMS 602-99), Commentary on Building Code...

Verdict Rendered
After the Grays Harbor County Courthouse in Montesano, Washington, was severely damaged by an earthquake in 1999, the surrounding community decided to preserve it. A design/build approach...

The Viable Alternative
The Benicia-Martinez Bridge is a high-level, welded deck truss bridge that carries Interstate 680 over the eastern end of the Carquinez Strait near San Francisco. To bring the bridge into...

Design Live Loads for Parking Garages
The objective of this research project is to obtain a better understanding of parking garage live loads and to recommend an appropriate value for design. A load survey was conducted in...

Evaluation of KeySystem I Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report describes an evaluation to determine...

The Rationale for Above-Surface Facilities
The redevelopment of the U.S. Amundsen-Scott South Pole Station�currently in the beginning phases of construction�will include the largest and most ambitious example of an elevated station...

 

 

 

 

Return to search